Planned Projects 2003-2004

(FUNDED)

 

 

Perennial Projects

 

Paving Repairs ($50,000)

Paving repairs to parking lot and road surfaces to maintain them in good condition.  Also includes new paving projects for small areas.

 

            Concrete Repairs ($50,000)

                        Repairs to concrete infrastructure as required for safety and ADA. 

 

            Vehicle Replacements ($80,000)

Life cycle replacement of various vehicles dependent on age and condition.  Includes Maintenance vehicles but not vehicles assigned to other departments.

 

Educational and General

 

            Jack Stadium Parking – Pave ($225,000) (DELETED)

Paving of the parking area used by students and staff for overflow parking.  This will also enhance parking for home football games.

           

            Sieg – Renovate Bridge ($100,000)

Removal of the steel bridge and installation of a covered wood bridge.  Old steel supports will be reused.

           

            Classroom Furniture ($200,000)

                        Replacement of older classroom furniture on an as needed basis.

           

            Alternate Electrical Supply for Main Feeders ($100,000) (ON HOLD)

                        Installation of alternative main power feed to the University.  This is needed to prevent                                                          extended downtime should the main breakers or service lines fail.

 

            Room Ventilator Replacement – Raub Hall ($800,000)

Replacement of the in-wall room ventilators.  The existing units are noisy, a replacement issue and do not provide adequate control of temperature.

 

            Clearfield Medical Facility Programming Study ($50,000)

Scope and cost study for the next anticipated educational building at the Clearfield Campus.  The study will support Capital funding and construction by DGS.

 

            KCSD Properties – Pave new parking lot. ($200,000)

Improvement of student and staff parking by paving the new dirt parking acquired with the KCSD property purchases.  This is for the triangular lot only.  Funded by LHU Foundation.

 

            Parking Lot – Medical Professions Bldg. ($350,000)

A new parking lot located between the old Vo-Tech bldg and the Student Recreation Center.

           

            East Campus Facilities Infrastructure Upgrades ($500,000)

Roof replacements, boiler upgrade design and security at newly acquired East Campus.

 

            New Maintenance Shop Connectivity ($25,000)

                        Fiber optics to the new maintenance area in the old Vo-Tech complex.

 

Bleachers ($30,000)

                        New bleachers for the soccer field…safety related issue.

           

Auxiliary

 

            Campus Village Fire Alarms and Sprinklers Work ($543,000) (funded and executed by LHU Foundation)

                       

           

 

 

 

Capital - None