CARPENTER'S SCHEDULED WORK |
|
11/6/2009 |
71994 |
A |
SFAB |
SLOAN - OUTSIDE FRONT STEPS - METAL STRIPS ARE LOOSE. |
|
4/16/2009 |
68170 |
B |
EASTCAM |
Roof in auditorium is leaking in the stairways at the back of the
auditorium. |
|
4/17/2009 |
68230 |
C1 |
REC_CTR |
REC CENTER FRONT DESK - ROOF DRAIN OVER FRONT DESK IS LEAKING. |
|
10/29/2009 |
71872 |
C1 |
SCC |
SIEG - WOMEN'S RESTROOM - SCREWS CAME OUT OF DIVIDER (GREEN) WALL. |
|
1/20/2009 |
66409 |
C1 |
HPB |
Insulate and replace ceiling tiles. Keep this work order for summer
project. The roof above the ramp area needs to be insulated and
vented properly. |
|
6/5/2009 |
69171 |
C1 |
BDH |
Location: Booth Areas, Upper and Lower Bentley. Both floors have
one booth each that have received a rip over the past school year.
Each are located on the Sullivan Side of Bentley. |
|
7/13/2009 |
69565 |
C1 |
MISC |
PER OFFICER MCCAULEY - THE RAILING ON THE SIDEWALK IN AREA 4 (SMALL
STAFF LOT OFF SUSQUEHANNA AVENUE BY ZG) IS FALLING APART. |
|
8/18/2009 |
70338 |
C1 |
RLC |
2ND SHIFT//Please hang whiteboard at Robi 706 Office, Dr. Brett
Everhart. There are post-it notes on the wall where the whiteboard
is to be hung. |
|
8/25/2009 |
70529 |
C1 |
TFH |
WE NEED TO RESEAL ALONG THE OUTSIDE STEPS AT THE BACK CORNER
TOWARDS ZIMMERLI. THERE ARE CRACKS ALLOWING WATER TO INFILTRATE THE
BRICK WALL. USE SIKKA FLEX BRAND CAULKING. |
|
9/1/2009 |
70726 |
C1 |
CV |
2ND SHIFT//130 Living room Window blind not working |
|
9/2/2009 |
70745 |
C1 |
WRH |
WOOLRIDGE HALL GAME ROOM - "TIME CRISIS" VIDEO GAME PLEXI GLASS
PANEL IS BROKEN - SHARP EDGES. |
|
9/2/2009 |
70748 |
C1 |
RH |
RAUB HALL ROOM #308 - TILES NEED REPLACED (FROM PREVIOUS LEAK THAT
WAS FIXED). |
|
9/2/2009 |
70749 |
C1 |
RH |
RAUB HALL TILES BY THE 3RD FLOOR WATER CLOSET NEED REPLACED. |
|
9/2/2009 |
70752 |
C1 |
NRH |
NORTH HALL GAME ROOM - BRACKET IS BROKEN OFF ON SCREEN (IN
CUSTODIAN CLOSET). |
|
9/2/2009 |
70767 |
C1 |
MRH |
MCENTIRE HALL 2ND FLOOR (TOWER END) BATHROOM - PAPER TOWEL DISPENSER
NOT WORKING (OLD STYLE). |
|
9/2/2009 |
70772 |
C1 |
ZG |
ZG MEN'S LOCKER ROOM - PAPER TOWEL DISPENSER OPENS WITHOUT A KEY
(TAB IS BROKEN). |
|
9/2/2009 |
70773 |
C1 |
NRH |
NORTH HALL 3RD FLOOR STUDY LOUNGE - CHAIN ON BLIND IS BROKEN. |
|
9/3/2009 |
70810 |
C1 |
EASTCAM |
Bulletin board outside of J-108 East Campus fell down and needs to
be reinstalled. |
|
10/1/2009 |
71325 |
C1 |
WRH |
Install insulation in windows above game room heating piping to
prevent freezing |
|
10/20/2009 |
71664 |
C1 |
GRH |
The plaster is getting ready to fall off the stairwell wall, it's
the stairwell towards High Hall on the 4th floor. |
|
11/4/2009 |
71953 |
C1 |
BDH |
Install plastic corners in various areas throughout Bentley. |
|
11/10/2009 |
72064 |
C1 |
MNTBLDG |
George please paint the new barricade top safety yellow. |
|
1/28/2008 |
60033 |
C3 |
ROTC |
MATERIAL HAS ARRIVED. Need more shelving in supply room at campus
village. See Stacy at ROTC for details. x2265 MARK PLEASE GO
TALK TO HER AND SEE IF THEY CAN SHOW YOU HOW MUCH THEY NEED
INSTALLED. LETS TALK ONCE THEY SHOW YOU WHAT THEY NEED. |
|
7/29/2009 |
69925 |
C3 |
CHA |
Put up a video projection wall screen in the classroom in the
basement. |
|
9/3/2009 |
70805 |
C3 |
RLC |
RLC ROOM #217 - WOULD LIKE NAILS PUT IN WALL TO HANG DEGREES (SHE
WILL MARK WALL WHERE THEY ARE TO BE PUT). |
|
Date |
W/O# |
Priority |
Building |
Work Description |
|
ELECTRICIAN'S SCHEDULED WORK |
|
9/9/2009 |
70906 |
C1 |
SL |
STEVENSON LIBRARY COMPUTER LAB ON GROUND FLOOR - LIGHT DOES NOT
WORK. |
|
9/22/2009 |
71194 |
C1 |
RRH |
One of the outlets in room 223 is not working. Please have an
electrician check it. |
|
9/29/2009 |
71287 |
C1 |
SFAB |
SLOAN ROOM 242 - CEILING LIGHT NEEDS FIXED. |
|
10/8/2009 |
71492 |
C1 |
SL |
STEVENSON LIBRARY - LIGHT IN FRONT OF REFERENCE DESKS KEEPS GOING ON
AND OFF. |
|
10/8/2009 |
71500 |
C1 |
RRH |
RUSSELL HALL MIDDLE STAIRWELL BETWEEN 2ND & 3RD FLOOR - LIGHT NEEDS
CHANGED. |
|
10/21/2009 |
71689 |
C1 |
WRH |
WOOLRIDGE HALL - STAIRWELL END DOWN BY ROOM G2 & G3 - LIGHT IS OUT
BETWEEN GROUND AND FIRST FLOOR. |
|
10/21/2009 |
71690 |
C1 |
WRH |
WOOLRIDGE HALL - BUFFER/SCRUBBER HANDLE IS LOOSE (IN 3RD FLOOR
CUSTODIAL CLOSET). |
|
10/21/2009 |
71691 |
C1 |
WRH |
WOOLRIDGE HALL ROOM #202 - CEILING EXIT LIGHT NEEDS NEW PLASTIC
COVER. |
|
10/21/2009 |
71704 |
C1 |
WRH |
the electrical outlet near the doors of room 302-306 are burnt
out... we already tried the breaker and it didn't work. |
|
10/22/2009 |
71715 |
C1 |
USSB |
Hook up new lighting control. Final connections will be made when
lights are switched over from the old system to the new. |
|
10/28/2009 |
71847 |
C1 |
RRH |
Both desk lamps in room 334 Russell hall are malfunctioning. One
smokes when turned on, the other simply won't turn on. Please
repair, thanks! |
|
10/30/2009 |
71897 |
C1 |
SL |
There is a disconnect handle broken for AC#4 in the ground floor
custodial closet beside the elevator. When they need to change
filters they have to open the panel box and manipulate it of and on,
kind of close to the bare wires. |
|
11/9/2009 |
72003 |
C1 |
EASTCAM |
The Union Office was moved to East Campus Gym complex earlier in the
summer. Cat 6 needs to be pulled into this room for the phone and
computer. |
|
2/10/2009 |
66865 |
C1 |
REC_CTR |
Heat tape controller sounds like contactors are chattering. |
|
8/20/2009 |
70369 |
C1 |
RRH |
RUSSELL HALL - HIGH SPEED BUFFER NEEDS REPAIRED (IN CUSTODIAL CLOSET
SULLIVAN SIDE. |
|
8/25/2009 |
70499 |
C1 |
ZG |
ZG - INSIDE POOL OFFICE - PLASTIC LIGHT COVER IS HANGING DOWN ABOVE
THE DOOR. |
|
9/2/2009 |
70735 |
C1 |
RRH |
RUSSELL HALL 2ND FLOOR - LIGHT PULL STRINGS ABOVE SINK NEED FIXED. |
|
9/23/2009 |
71206 |
C1 |
RRH |
RUSSELL HALL - 2ND FLOOR STAIRWELL ON SULLIVAN SIDE - THE LIGHT
COVER NEEDS PUT BACK ON (NEED SCREWS) |
|
10/1/2009 |
71337 |
C1 |
PA |
There is a globe missing off of the 3rd street light on the steps
going up from Price to North. |
|
10/8/2009 |
71472 |
C1 |
SRH |
SMITH HALL - 1ST FLOOR LOUNGE BY MICROWAVE - LIGHT NOT WORKING
(CHANGED BULB STILL NOT WORKING). |
|
10/26/2009 |
71752 |
C1 |
SRH |
Smith Hall: Room 356- Upon entering the room on the left side, the
outlet on the back wall is emitting sparks and needs repaired. |
|
10/28/2009 |
71773 |
C1 |
RRH |
RUSSELL HALL 2ND FLOOR WOMEN'S SHOWER (LIBRARY SIDE) - LIGHT NOT
WORKING (REPLACED BULB). |
|
10/21/2009 |
71708 |
C1 |
HNMB |
Extend existing electrical outlets for computers and stamp machine
in the old plumbers shop. Install 4 data lines in this room also.
One for the stamp machine, two for computers and one as a spare. |
|
11/4/2009 |
71951 |
C1 |
CHA |
Repair pedestrian light by salt shed. |
|
11/4/2009 |
71952 |
C1 |
AH |
Repair pole light on McEntire side of the lot. |
|
Date |
W/O# |
Priority |
Building |
Work Description |
|
GROUNDSKEEPER'S SCHEDULED WORK |
|
10/29/2009 |
71862 |
A |
CG |
Level pavers in front of Rec Center |
|
10/13/2009 |
71547 |
C1 |
USSB |
EQUIPMENT DISPOSAL FORM NO D 4063 SUBMITTED BY TROY DERMOTA. SEE
ATTACHED REQUEST. |
|
11/3/2009 |
71940 |
C1 |
MNTBLDG |
The Trolley drivers asked if the grand canyon at the rear of the
Maintenance shop could be filled in so they are able to drive
through. Can we get some railroad ballast that would stay packed in? |
|
11/9/2009 |
72032 |
C1 |
RLC |
RLC - REMOVE FOLDING TABLE ON 1ST FLOOR HALL TOWARDS WOMEN'S
BATHROOM. |
|
10/28/2009 |
71783 |
C1 |
RLC |
RLC 7TH FLOOR HALLWAY - BROKEN CABINETS NEED REMOVED. |
|
10/29/2009 |
71881 |
C1 |
EASTCAM |
E. CAMPUS ROOM J108 - REMOVE 5 FOLDING RED CHAIRS IN HALLWAY. |
|
11/11/2009 |
72084 |
E |
CG |
Please clean up old burners left on the grounds from the ESCO
project. There are 2 burners on pallets that where left in the alley
by the boiler room. Also need 2 burners taken out of the boiler room
at Ulmer North. They need to be taken to the boiler room. |
|
Date |
W/O# |
Priority |
Building |
Work Description |
|
HVAC'S SCHEDULED WORK |
|
10/29/2009 |
71867 |
B |
SCC |
TOO COLD |
|
10/29/2009 |
71883 |
B |
REC_CTR |
No Heat per PAF |
|
9/24/2009 |
71222 |
C |
AH |
Replace sump pump in steam pump pit |
|
10/19/2009 |
71633 |
C |
ZG |
EX FAN. BLOWER DROPPED |
|
7/28/2009 |
69908 |
C1 |
RRH |
replace valve and check controls for lobby unit, also check make up
air |
|
8/31/2009 |
70647 |
C1 |
BDH |
Replace IOM in mechanical room and re-explain/write the procedure
for re-setting pumps/chillers after power bump |
|
9/14/2009 |
70980 |
C1 |
ZG |
Pipe leaking in boys locker room, custodian put can under to catch
leak |
|
9/21/2009 |
71147 |
C1 |
USSB |
ULMER SOUTH ROOM #409 - HEAT UNIT ON WALL BY WINDOW IS LEAKING. |
|
9/22/2009 |
71196 |
C1 |
GRH |
Heat pipe is leaking in room 421 in the right side corner. Thanks! |
|
9/24/2009 |
71217 |
C1 |
SRH |
check steam valve on heating loop to see if it's leaking through. |
|
10/1/2009 |
71323 |
C1 |
MISC |
-Drain coil at PUB AHU that froze last year(2X), push anti-freeze
through it also. |
|
10/1/2009 |
71326 |
C1 |
MISC |
Prepare cooling towers for winter, drain feed water lines to cooling
towers, isolate and anti-freeze as necessary. Drain cooling towers.
Pull pumps if necessary. |
|
10/7/2009 |
71468 |
C1 |
MRH |
The air bleeder valve is leaking on the heating unit. It needs
replaced as it is leaking on the floor. We have a pan catching the
water currently. |
|
10/13/2009 |
71561 |
C1 |
RRH |
No heat per custodian, room 308/whole building |
|
10/18/2009 |
71620 |
C1 |
BDH |
Sharpen meat slicer blade in Upper Bentley. |
|
10/19/2009 |
71625 |
C1 |
TFH |
Replace condensate pump and repair leak on #1 boiler |
|
10/19/2009 |
71652 |
C1 |
SCC |
Convert Sieg gas burner from Honeywell control to Fireye Mec series
control, the Honeywell does not recycle after power outages. |
|
10/21/2009 |
71681 |
C1 |
MRH |
7th floor study lounge heater broken |
|
10/22/2009 |
71724 |
C1 |
UNSB |
Leak at circulating pump flange, contractor isolated it after firing
new boilers. |
|
10/22/2009 |
71727 |
C1 |
DAC |
Sulfur smell at bottom of grand stairwell. |
|
10/22/2009 |
71729 |
C1 |
RH |
See attached email, let's check the rest of the rooms for fans being
turned off and stats not working, did we get all the water out. |
|
10/23/2009 |
71737 |
C1 |
EASTCAM |
EAST CAMPUS -ENTIRE BUILDING - VERY WARM CHECK THERMOSTATS. |
|
10/29/2009 |
71885 |
C1 |
UNSB |
Repair damper motor on cooling tower |
|
10/29/2009 |
71886 |
C1 |
EASTCAM |
Glenda Fielders' office is too hot, probably t-stat. |
|
11/3/2009 |
71938 |
C1 |
CHA |
There are several faculty members with complaints of no heat in the
CHA, rooms 315 - 317. Would you have someone check on this? The
thermometer in CHA 310 is reading 68 degrees currently. This wing
seems quite a bit cooler than the wing with CHA, rooms |
|
11/5/2009 |
71957 |
C1 |
RH |
Raub 308 Cold air is blowing from the radiator and students have to
wear coats, hats and gloves in class, per the professor. |
|
11/6/2009 |
71986 |
C1 |
BDH |
Middle deep fryer (Upper Bentley kitchen) is backfiring flames out
of the top when it heats. Steve said it needs the fan replaced and
Ed ordered them previously to repair a different fryer. Can they
replace the fans on the other 2 fryers that have old fan |
|
11/6/2009 |
71992 |
C1 |
SH |
SULLIVAN HALL ROOM 202 AND IN HALLWAY AND POSSIBLY THE PROVOST'S
OFFICE - WINTERIZE AIR CONDITIONERS. Do them all- JDC |
|
11/8/2009 |
72002 |
C1 |
BDH |
The air screen in Eagle Rock not working. It's not getting cold,
it's 70 degrees. |
|
11/9/2009 |
72014 |
C1 |
BDH |
Repair cooler at Eagle Rock Bentley |
|
11/9/2009 |
72016 |
C1 |
MRH |
The dryer vents need put back together there are several away from
the wall. |
|
11/9/2009 |
72034 |
C1 |
MRH |
MCENTIRE HALL ROOM #407 - HEAT NOT WORKING. |
|
11/9/2009 |
72041 |
C1 |
RRH |
There is no heat in room 328 Russell Hall. It is a corner room and
is getting very cold at night. |
|
11/10/2009 |
72060 |
C1 |
SH |
SULLIVAN HALL 2ND FLOOR LOBBY - GAS ODOR. |
|
11/12/2009 |
72090 |
C1 |
HPB |
No heat in Dan Gales office. |
|
11/12/2009 |
72091 |
C1 |
HPB |
2nd shift reported that the air filters to the hallway unit in front
of the bathrooms, bottom of the ramp, look unused. Check this unit
to see if it is running please. |
|
9/2/2009 |
70788 |
C2 |
TFH |
2nd shift change air filters in rooftop units and office units, 1st
shift will do the gym floor units and TFHA. |
|
10/27/2009 |
71756 |
C2 |
RRH |
I have an air conditioner in my window that is directly across from
where I sit at my desk. Cold air is coming in on my legs and across
my desk and it is freezing. Would it be possible for someone to
cover my ac with plastic as they did last year? |
|
11/5/2009 |
71975 |
C2 |
JS |
I just wanted to double-check that the ice machine at Jack
Stadium/concession stand has been cleaned and drained for the
season. We would like it up and running again by April 1st, 2010. |
|
11/10/2009 |
72063 |
C2 |
CBC |
Replace air filters in new Clearfield building |
|
Date |
W/O# |
Priority |
Building |
Work Description |
|
LOCKSMITH'S SCHEDULED WORK |
|
11/6/2009 |
71982 |
A |
SH |
Officer Merryman requested I submit this work order for the doors
facing Bentley, closest to N. Fairview, the right side stays ajar
when closed. |
|
9/17/2009 |
71112 |
C1 |
SFAB |
SLOAN - HANDICAPPED DOOR ACROSS FROM ROTC IS STICKING AND WON'T
CLOSE COMPLETELY. |
|
10/20/2009 |
71659 |
C1 |
SFAB |
Front doors are not working properly. They are locked down but are
sticking. |
|
10/23/2009 |
71738 |
C1 |
EASTCAM |
EAST CAMPUS 1ST FLOOR STAIRWELL BETWEEN J & B SIDES - DOOR THUMPING
WHEN CLOSING (SEE HOLLY WITH QUESTIONS). |
|
11/6/2009 |
71997 |
C1 |
GRH |
GROSS HALL 4TH FLOOR - CUSTODIAN DOOR LOCK GETS STUCK. |
|
11/6/2009 |
72001 |
C1 |
TFH |
Repair the closer hold open latch on the left door at the ramp
entrance closest to Himes. |
|
11/9/2009 |
72012 |
C1 |
WRH |
replace a key for box 23 |
|
Date |
W/O# |
Priority |
Building |
Work Description |
|
PAINTER'S SCHEDULED WORK |
|
8/12/2009 |
70116 |
B |
EASTCAM |
2ND SHIFT// In the Gym 2nd floor classroom section there is a roof
drain that is leaking in the top of the Stairwell towards the alley.
It is actually leaking on the cast iron elbow where the pipe turns
down into the wall. |
|
2/7/2007 |
54024 |
C1 |
WRH |
The lower card access door needs painted. |
|
6/10/2009 |
69186 |
C1 |
SFAB |
Marcon HAS repaired the roof in the corner of the art gallery. The
ceiling will need to re repainted in that area after they are done.
There is no asbestos in the ceiling material per Andy Love. |
|
8/20/2009 |
70403 |
C1 |
RLC |
RLC 4TH FLOOR STAIRWELL DOOR TOWARDS RAUB HALL NEEDS PAINTED -
RUSTED. |
|
8/20/2009 |
70410 |
C1 |
RLC |
RLC 1ST FLOOR DOOR - PAINT INSIDE DOOR TOWARDS RAUB HALL. |
|
5/7/2009 |
68838 |
C3 |
SRH |
Please repaint the area on the ceiling the stairwell closest to
Woolridge that leads out from the rec room. It is peeling badly. |
|
8/3/2004 |
35728 |
D |
BDH |
Employee entrance hallway walls and steps need painted. |
|
Date |
W/O# |
Priority |
Building |
Work Description |
|
PLUMBER'S SCHEDULED WORK |
|
9/14/2009 |
70986 |
B |
CV |
Room 125 pipe broken per Wendy Walsh |
|
9/15/2009 |
71027 |
B |
RLC |
Location; C3 Express, 1st Floor, Robinson Learning Center
Request: To install a deep sink to use along with hand wash sink to
follow state health codes. |
|
11/6/2009 |
71991 |
B |
BDH |
Bentley steam kettle won't shut off. |
|
10/14/2009 |
71580 |
C |
CG |
IVY LANE FOUNTAIN CLEAN LEAVES AND PINE NEEDLESS OUT OF FOUNTAIN,
WORK ON FOUNTAIN, CHECK FOUNTAIN, ETC. |
|
8/11/2009 |
70086 |
C1 |
NRH |
NORTH HALL CUSTODIAN BREAK ROOM ON GROUND FLOOR - PIPES ARE
DRIPPING. |
|
9/8/2009 |
70852 |
C1 |
GRH |
sink won't shut off on first floor women's rest room per Annette |
|
9/10/2009 |
70942 |
C1 |
CV |
CAMPUS VILLAGE - LEAK FROM ROOM 226 INTO 126 BATHROOM. |
|
9/16/2009 |
71085 |
C1 |
BDH |
Replace/repair sink @ dish room hand wash sink in upper Bentley.
Does not heat to proper temperature adequate for proper hand
washing.
(There is no hot water line to this sink, will need installed during
a shut down- JDC) |
|
9/17/2009 |
71115 |
C1 |
RRH |
1st floor women's restroom toilet won't shut off |
|
9/29/2009 |
71285 |
C1 |
HRH |
HIGH HALL 3RD FLOOR GIRLS REST ROOM - 1ST SINK IS CLOGGED. |
|
9/29/2009 |
71300 |
C1 |
SRH |
SMITH HALL 3RD FLOOR GIRLS WING SMALL BATHROOM - URINAL (NEXT TO
SINKS) IS LEAKING ON FLOOR. |
|
10/1/2009 |
71322 |
C1 |
MISC |
Winterize campus |
|
10/1/2009 |
71327 |
C1 |
SCC |
Winterize Sieg, coordinate with custodians for water needs and ATC
for heat |
|
10/2/2009 |
71386 |
C1 |
RRH |
3RD FLOOR/SULLIVAN SIDE, SHOWER WILL NOT SHUT OFF. AND THE SINK IS
CLOGGED. |
|
10/7/2009 |
71445 |
C1 |
BDH |
The sump pump in the freight elevator shaft is not working and there
is water in the shaft. |
|
10/8/2009 |
71490 |
C1 |
USSB |
ULMER SOUTH ROOM #409 - CEILING PIPE JOINT IS LEAKING NEAR WINDOW. |
|
10/14/2009 |
71572 |
C1 |
RRH |
RUSSELL HALL 2ND FLOOR WOMEN'S SHOWER ROOM (SULLIVAN SIDE) - SINK IS
CLOGGED. |
|
10/22/2009 |
71725 |
C1 |
RH |
Order and replace backflow preventer with different model that has
no relief drain. In penthouse above floor pumps. |
|
10/22/2009 |
71726 |
C1 |
RH |
Isolate/disconnect old steam powered domestic water heater from
domestic water system. |
|
10/30/2009 |
71892 |
C1 |
SL |
Remove old domestic hot water tank in mechanical room. Re-pipe
circulator.
Check all gate valves into hot water heater as it seems to fill very
slowly.
Good job for over break. |
|
11/5/2009 |
71963 |
C1 |
NRH |
North 5th floor girls bathroom the ceiling is wet in the last stall
on the right before anyone took a shower or cleaning it. North 3rd
floor girls bathroom there is a wet spot on the ceiling first light
in shower room. It was fixed but now it is wet again. |
|
11/5/2009 |
71966 |
C1 |
HH |
JEFF WALSH TO CALLED HE THINKS A PIECE NEEDS REPLACED IN THIS
COMMODE BECAUSE IT IS STILL SPORADICALLY RUNNING CONSTANTLY. THE
GUYS FIXED IT RECENTLY BECAUSE IT WAS RUNNING CONSTANTLY BUT IT
CONTINUES TO DO THIS. PLEASE CHECK. |
|
11/6/2009 |
71996 |
C1 |
RRH |
RUSSELL HALL 3RD FLOOR MEN'S BATHROOM - 1ST SINK ON RIGHT (SHOWER
SIDE) HAS LEAKY FAUCET. |
|
11/9/2009 |
72009 |
C1 |
DAC |
Room 223 (Bar) Sink in bar prep area - cold handle on faucet just
spins, does not turn water on. |
|
11/9/2009 |
72031 |
C1 |
NRH |
NORTH HALL 2ND FLOOR BATHROOM SHOWER HEAD IS LEAKING. |
|
11/9/2009 |
72040 |
C1 |
NRH |
NORTH HALL 3RD FLOOR MEN'S BATHROOM (STEVENSON WING) FLOODING. |
|
11/9/2009 |
72043 |
C1 |
RRH |
3rd Floor men's room 2nd toilet from end plugged and flooded floor.
Needs custodian to clean up floors. |
|
11/10/2009 |
72059 |
C1 |
PUB |
women's room back snack bar has plugged toilet |
|
11/12/2009 |
72092 |
C2 |
JS |
Winterize concession stand per Amy Bechdel after 11/6, winterize the
bathrooms after 11/22 per Carol Lug |
|
11/9/2009 |
72022 |
E |
ADMIN_BLDG |
PUMP HOUSE AREA NO FLOW LIGHT ON |